Project Overview
Five Projects in Detail

Luxury Residence Featuring a Wellness Floor
Ararat Grand Residences
Limassol, Cyprus
2025
In the spring of 2025, a comprehensive wellness floor was established in the basement of the Arrat Tower while the building was still in its shell construction phase. We managed the entire project lifecycle—from coordinating with local Cypriot partners, handling shipping and customs clearance, to on-site installation and staff training. The hyperbaric chamber was fully operational within three days, ensuring the client's construction schedule was seamlessly maintained.
Chamber
PLM152, 2-Person
Implementation
3 days until commissioning

Biohacking and Performance Studio
The Biohacking Club Munich
Pfarrstraße 14, Munich
2025
Delivery to the first floor was not feasible via the facade, nor with technical lifting equipment. Our team carried the steel modules—weighing up to 350 kilograms—piece by piece through a narrow staircase, without causing any damage to the building or the equipment. This was followed by four days of interior installation featuring glossy white panels, acoustic elements in a light wood finish, and beige armchairs. The operating units are positioned behind a wall opening in a separate technical room to ensure the chamber remains whisper-quiet.
Chamber
Professional Line Modular Chamber, 2-Person
Implementation
4 days interior fit-out

Premium Wellness Studio
Oxythea Düsseldorf
Rhine Promenade, Düsseldorf
2025
Between the Old Town and Karlsplatz, the designated area was already occupied by a Vacu-Flow system, with the requirement that both applications remain usable in parallel. We successfully handled delivery through the narrow, vehicle-lined Old Town alleyway and the complex access route with a custom-engineered transport solution. The interior features quilted synthetic leather in silver-white and a green carpet, seamlessly matching the studio's design. In August 2025, an acrylic glass door with a velvety white finish was added.
Chamber
Modular Chamber, 190 cm Module Height
Implementation
Installation during ongoing operations

Medical Longevity Center
Cell4Care Palma
Palma de Mallorca, Spain
2025
Cell4Care combines clinical standards with longevity services for international guests and residents. For this environment, we installed a two-seater modular chamber featuring a high-gloss gray exterior aligned with the clinic's color concept, an interior upholstered in silver-white quilted synthetic leather, and gray-and-black acoustic panels on the front wall. Delivery, installation, and certified staff training were completed within three days. A subsequent maintenance call was resolved within 24 hours via direct flight.
Chamber
PLM152, 2-Person
Implementation
3 days including training

Recovery and Lounge Studio
Cooldown Aschaffenburg
Kleinostheim near Aschaffenburg
2024, expansion 2025
In autumn 2024, we delivered the chamber featuring white wall cladding, brushed aluminum trim, an acrylic glass door, a 32-inch Smart TV, and an external climate control system for both the chamber and adjacent rooms. The deep black exterior wrap complements the studio's lounge aesthetic. In September 2025, the complete interior fit-out was completed in just five days, featuring high-gloss white wall and ceiling panels that contrast with the studio's matte acoustic elements, alongside a 50-inch 4K entertainment system.
Chamber
PLM152
Implementation
5 days interior installation
Two projects for which we are currently preparing the documentation.
ANTI Berlin
IUNE Medical Center
Process
How your project comes to life
From the initial inquiry to ongoing operation, we handle every step ourselves, including logistics, installation, and training.
01
We clarify your objectives, target audience, and budget to determine which chamber size best fits your offering.
02
We evaluate access routes, structural load capacity, ceiling height, electrical connections, and climate control—including installations in historic buildings, basements, or upper floors.
03
You select the exterior finish, panels, upholstery, flooring, lighting, and entertainment system. We tailor everything to seamlessly match your interior.
04
We handle transport, customs clearance, and specialized logistics. On-site installation typically takes three to five days.
05
Finally, we train your team. Following this, we support you with ongoing maintenance, spare parts, and on-site service.
Scope of Services
What We Cover
We do not just deliver the chamber, but provide full on-site implementation. This saves you the effort of coordinating between multiple contractors.
We handle foreign trade, customs clearance, and transport directly to destinations such as Cyprus or Mallorca, including scheduling coordination with your on-site contractors.
Narrow historic streets, winding entryways, basements, or first-floor locations without an elevator—we plan the delivery route in advance and, if necessary, carry modules weighing up to 350 kilograms by hand.
We tailor wall and ceiling panels, acoustic elements, quilted synthetic leather, flooring, armchairs, and exterior wrapping to match your interior.
External climate control systems for the chamber and adjacent rooms, with compressor units optionally placed in a separate technical room to ensure a quiet environment inside the chamber.
Smart TVs up to 50 inches, 4K systems, subtle warm white lighting, and an intuitive control interface requiring no extensive training.
Certified team training upon handover, followed by maintenance, spare parts, and on-site service support—including international coverage.
Frequently Asked Questions
Questions regarding project implementation
The most frequently discussed topics during an initial consultation.
Typically three to five days, depending on the model and configuration level. In Cyprus and Palma, the chamber was operational after three days, including staff training.
We assess the delivery route in advance. In Munich, we carried the steel modules up to the first floor via a narrow staircase without any damage to either the building or the equipment.
Yes. We tailor the panels, upholstery, flooring, lighting, branding wraps, and entertainment systems to match your interior. Future modifications are also possible, as demonstrated at Cooldown Aschaffenburg.
Yes. We have completed projects in Spain and Cyprus and fully manage communication, logistics, and installation.
Your team will receive certified training. Following this, we support you with maintenance, spare parts, and service operations—available within 24 hours if needed.
Yes. At Cooldown Aschaffenburg, we completely redesigned the interior one year after delivery, including an all-new entertainment system.
Let us discuss your facility.
Send us your floor plan, ceiling height, and site access conditions. We will provide you with an assessment regarding feasibility, scope of work, and project timeline.